Sunday 26 March 2017

Rose cottage update.

Just to show that even us experienced modellers can stuff up and have serious problems with our work, with all the extra rain and humidity over the last couple of weeks, the floor boards started to swell. 😒😒😒😒. I wasn't 100% sure of the reason but obviously the glue wasn't holding properly. This is not acceptable so the only way to fix it is to rip it up and start again. I am glad it happened here and not after its delivered, sometimes things go wrong, deal with it and fix it. My words of wisdom for a Sunday morning.
Fortunately when I started stripping the floors I found that the glue used hadn't gripped the veneers like it should have. The glue used, I think was the end of a can which was then thrown out, so it must have just been on the end of its usability and it was an extremely hot day when laid (40+), which could have contributed. A new container of glue and both levels of flooring done. They are looking beautiful again and stable.





But on a brighter note, the kitchen is starting to look like a room and apart from a couple of pieces of trim it and the smallest room in the house are done.The lower Half of the walls are tiled, the upper area painted and the ceiling is done as painted planked boards, it all adds character to a simple room.



No it's not the toilet but the space under the stairs.

So apart from skirting boards and lighting, the entrance, living room and  master bedroom are basically done.

Until next time.

yours in miniatures

Warren

No comments:

Post a Comment